TO: Lockheed Martin GNC Personnel for OSIRIS-REx SUBJECT: NAV DELIVERY OF FINAL MPF FOR OSIRIS-REX TCM-1 ******************************************************************************************** THE MPF IS LOCATED ON THE FOB IN THE FOLLOWING DIRECTORY: ORXFOB/FDS/MPF orx_mpf_tcm1_final_od005_v1.xml THE SPICE BINARY FILE IS LOCATED ON THE FOB IN THE FOLLOWING DIRECTORY: ORXFOB/FDS/SPK orx_160909_161228_160919_od005_tcm1_v2.bsp ******************************************************************************************** BRIEF -- Version 4.0.0, September 8, 2010 -- Toolkit Version N0065 Summary for: orx_160909_161228_160919_od005_tcm1_v2.bsp Body: OSIRIS-REX (-64) Start of Interval (ET) End of Interval (ET) ----------------------------- ----------------------------- 2016 SEP 09 07:00:00.000 2016 DEC 28 18:01:08.184 Comments: The delivered MPF contains the final design of the TCM-1 maneuver. This file was generated using the x01orx_mpdf_tcm1.xml MPDF file. The delivered trajectory file contains the TCM-1 maneuver but does not contain any others future propulsive maneuvers. The delivered trajectory file should be used with DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered files can be found on zion at: /nav/orex/deliveries/mnvr/tcm01/ BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160909_161228_160919_od005_tcm1_v2.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 09 07:00:00.000 2016 DEC 28 18:01:08.184