TO: LM personnel for OSIRIS-REx SUBJECT: DELIVERY OF OSIRIS-REx PRE-LAUNCH FULL MISSION EPHEMERIS FOR SEP 8 OPEN (DAY06, M60) ******************************************************************************************** THE SPICE BINARY FORMAT FILE IS LOCATED ON THE FOB: /FOB/orxfob/documentLibrary/FDS/SPK/orx_160908_231024_pgaa3_day06m60_v1.bsp ******************************************************************************************** Trajectory span for file on Day06, Open of 2-hr Window: Span Start: 08-SEP-2016 23:06:08.282 ET Span End: 24-OCT-2023 23:21:18.962 ET Comments: The delivery is meant for use by the Lockheed Martin Team for OSIRIS-REx for upload to the spacecraft for FSW Build 6.1. This is a delivery of the full mission ephemeris using the PGAA3 data set for the Day 06, open of 2-hour launch window case. The file is in SPICE binary (.bsp) format and spans the entire mission duration starting at SEP - 20 minutes. Unlike previous deliveries, this file has no dependency on the ephemeris of asteroid Bennu (2101955). The delivered trajectory files should be used with the DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered SPICE binary format file can be found on Hogan at: /nav/orex/deliveries/traj/reftraj/ ******************************************************************************************** Delivered to orexfob/FDS/SPK for MSA mission ephemeris upload, fsw 6.1 Comments: This is the latest full mission trajectory for Day 6 of launch period, Sep 8, 2016 open of window (-60 min). The file is a merge of 3 segments: 1. pre-TIP to TIP. This was generated by Dan Wibben (Kinetx) from the PGAA-3 Matlab file from LSP/ULA (Atlas5_SPARTA_OREX_PGAA3_NOM_20160909_M60_GSFC.bsp). 2. TIP to End of Outbound Cruise. This is a GMAT optimization done by Brent Barbee (GSFC), then Dale Stanbridge (Kinetx) ran it through Mirage and generated the P and SPK this outbound cruise trajectory spk (p.06.bsp). 3. End of Outbound Cruise (start of proxops) to 24-OCT-2023 (release + 30 days). This is a trajectory from Brian Sutter (LM) (StartProxOps_To_ReleasePlus30days.bsp). BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160908_231024_pgaa3_day06m60_v1.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 08 23:06:08.282 2023 OCT 24 23:21:18.962 TO: LM personnel for OSIRIS-REx SUBJECT: DELIVERY OF OSIRIS-REx PRE-LAUNCH FULL MISSION EPHEMERIS FOR SEP 8 OPEN (DAY06, M60) ******************************************************************************************** THE SPICE BINARY FORMAT FILE IS LOCATED ON THE FOB: /FOB/orxfob/documentLibrary/FDS/SPK/orx_160908_231024_pgaa3_day06m60_v1.bsp ******************************************************************************************** Trajectory span for file on Day06, Open of 2-hr Window: Span Start: 08-SEP-2016 23:06:08.282 ET Span End: 24-OCT-2023 23:21:18.962 ET Comments: The delivery is meant for use by the Lockheed Martin Team for OSIRIS-REx for upload to the spacecraft for FSW Build 6.1. This is a delivery of the full mission ephemeris using the PGAA3 data set for the Day 06, open of 2-hour launch window case. The file is in SPICE binary (.bsp) format and spans the entire mission duration starting at SEP - 20 minutes. Unlike previous deliveries, this file has no dependency on the ephemeris of asteroid Bennu (2101955). The delivered trajectory files should be used with the DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered SPICE binary format file can be found on Hogan at: /nav/orex/deliveries/traj/reftraj/ ******************************************************************************************** Delivered to orexfob/FDS/SPK for MSA mission ephemeris upload, fsw 6.1 Comments: This is the latest full mission trajectory for Day 6 of launch period, Sep 8, 2016 open of window (-60 min). The file is a merge of 3 segments: 1. pre-TIP to TIP. This was generated by Dan Wibben (Kinetx) from the PGAA-3 Matlab file from LSP/ULA (Atlas5_SPARTA_OREX_PGAA3_NOM_20160909_M60_GSFC.bsp). 2. TIP to End of Outbound Cruise. This is a GMAT optimization done by Brent Barbee (GSFC), then Dale Stanbridge (Kinetx) ran it through Mirage and generated the P and SPK this outbound cruise trajectory spk (p.06.bsp). 3. End of Outbound Cruise (start of proxops) to 24-OCT-2023 (release + 30 days). This is a trajectory from Brian Sutter (LM) (StartProxOps_To_ReleasePlus30days.bsp). BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160908_231024_pgaa3_day06m60_v1.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 08 23:06:08.282 2023 OCT 24 23:21:18.962 TO: LM personnel for OSIRIS-REx SUBJECT: DELIVERY OF OSIRIS-REx PRE-LAUNCH FULL MISSION EPHEMERIS FOR SEP 8 OPEN (DAY06, M60) ******************************************************************************************** THE SPICE BINARY FORMAT FILE IS LOCATED ON THE FOB: /FOB/orxfob/documentLibrary/FDS/SPK/orx_160908_231024_pgaa3_day06m60_v1.bsp ******************************************************************************************** Trajectory span for file on Day06, Open of 2-hr Window: Span Start: 08-SEP-2016 23:06:08.282 ET Span End: 24-OCT-2023 23:21:18.962 ET Comments: The delivery is meant for use by the Lockheed Martin Team for OSIRIS-REx for upload to the spacecraft for FSW Build 6.1. This is a delivery of the full mission ephemeris using the PGAA3 data set for the Day 06, open of 2-hour launch window case. The file is in SPICE binary (.bsp) format and spans the entire mission duration starting at SEP - 20 minutes. Unlike previous deliveries, this file has no dependency on the ephemeris of asteroid Bennu (2101955). The delivered trajectory files should be used with the DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered SPICE binary format file can be found on Hogan at: /nav/orex/deliveries/traj/reftraj/ ******************************************************************************************** Delivered to orexfob/FDS/SPK for MSA mission ephemeris upload, fsw 6.1 Comments: This is the latest full mission trajectory for Day 6 of launch period, Sep 8, 2016 open of window (-60 min). The file is a merge of 3 segments: 1. pre-TIP to TIP. This was generated by Dan Wibben (Kinetx) from the PGAA-3 Matlab file from LSP/ULA (Atlas5_SPARTA_OREX_PGAA3_NOM_20160909_M60_GSFC.bsp). 2. TIP to End of Outbound Cruise. This is a GMAT optimization done by Brent Barbee (GSFC), then Dale Stanbridge (Kinetx) ran it through Mirage and generated the P and SPK this outbound cruise trajectory spk (p.06.bsp). 3. End of Outbound Cruise (start of proxops) to 24-OCT-2023 (release + 30 days). This is a trajectory from Brian Sutter (LM) (StartProxOps_To_ReleasePlus30days.bsp). BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160908_231024_pgaa3_day06m60_v1.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 08 23:06:08.282 2023 OCT 24 23:21:18.962 TO: LM personnel for OSIRIS-REx SUBJECT: DELIVERY OF OSIRIS-REx PRE-LAUNCH FULL MISSION EPHEMERIS FOR SEP 8 OPEN (DAY06, M60) ******************************************************************************************** THE SPICE BINARY FORMAT FILE IS LOCATED ON THE FOB: /FOB/orxfob/documentLibrary/FDS/SPK/orx_160908_231024_pgaa3_day06m60_v1.bsp ******************************************************************************************** Trajectory span for file on Day06, Open of 2-hr Window: Span Start: 08-SEP-2016 23:06:08.282 ET Span End: 24-OCT-2023 23:21:18.962 ET Comments: The delivery is meant for use by the Lockheed Martin Team for OSIRIS-REx for upload to the spacecraft for FSW Build 6.1. This is a delivery of the full mission ephemeris using the PGAA3 data set for the Day 06, open of 2-hour launch window case. The file is in SPICE binary (.bsp) format and spans the entire mission duration starting at SEP - 20 minutes. Unlike previous deliveries, this file has no dependency on the ephemeris of asteroid Bennu (2101955). The delivered trajectory files should be used with the DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered SPICE binary format file can be found on Hogan at: /nav/orex/deliveries/traj/reftraj/ ******************************************************************************************** Delivered to orexfob/FDS/SPK for MSA mission ephemeris upload, fsw 6.1 Comments: This is the latest full mission trajectory for Day 6 of launch period, Sep 8, 2016 open of window (-60 min). The file is a merge of 3 segments: 1. pre-TIP to TIP. This was generated by Dan Wibben (Kinetx) from the PGAA-3 Matlab file from LSP/ULA (Atlas5_SPARTA_OREX_PGAA3_NOM_20160909_M60_GSFC.bsp). 2. TIP to End of Outbound Cruise. This is a GMAT optimization done by Brent Barbee (GSFC), then Dale Stanbridge (Kinetx) ran it through Mirage and generated the P and SPK this outbound cruise trajectory spk (p.06.bsp). 3. End of Outbound Cruise (start of proxops) to 24-OCT-2023 (release + 30 days). This is a trajectory from Brian Sutter (LM) (StartProxOps_To_ReleasePlus30days.bsp). BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160908_231024_pgaa3_day06m60_v1.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 08 23:06:08.282 2023 OCT 24 23:21:18.962 TO: LM personnel for OSIRIS-REx SUBJECT: DELIVERY OF OSIRIS-REx PRE-LAUNCH FULL MISSION EPHEMERIS FOR SEP 8 OPEN (DAY06, M60) ******************************************************************************************** THE SPICE BINARY FORMAT FILE IS LOCATED ON THE FOB: /FOB/orxfob/documentLibrary/FDS/SPK/orx_160908_231024_pgaa3_day06m60_v1.bsp ******************************************************************************************** Trajectory span for file on Day06, Open of 2-hr Window: Span Start: 08-SEP-2016 23:06:08.282 ET Span End: 24-OCT-2023 23:21:18.962 ET Comments: The delivery is meant for use by the Lockheed Martin Team for OSIRIS-REx for upload to the spacecraft for FSW Build 6.1. This is a delivery of the full mission ephemeris using the PGAA3 data set for the Day 06, open of 2-hour launch window case. The file is in SPICE binary (.bsp) format and spans the entire mission duration starting at SEP - 20 minutes. Unlike previous deliveries, this file has no dependency on the ephemeris of asteroid Bennu (2101955). The delivered trajectory files should be used with the DE424 planetary ephemeris. If you have any questions about this delivery, please don't hesitate to contact me via email and/or phone call. Internal Accounting: The delivered SPICE binary format file can be found on Hogan at: /nav/orex/deliveries/traj/reftraj/ ******************************************************************************************** Delivered to orexfob/FDS/SPK for MSA mission ephemeris upload, fsw 6.1 Comments: This is the latest full mission trajectory for Day 6 of launch period, Sep 8, 2016 open of window (-60 min). The file is a merge of 3 segments: 1. pre-TIP to TIP. This was generated by Dan Wibben (Kinetx) from the PGAA-3 Matlab file from LSP/ULA (Atlas5_SPARTA_OREX_PGAA3_NOM_20160909_M60_GSFC.bsp). 2. TIP to End of Outbound Cruise. This is a GMAT optimization done by Brent Barbee (GSFC), then Dale Stanbridge (Kinetx) ran it through Mirage and generated the P and SPK this outbound cruise trajectory spk (p.06.bsp). 3. End of Outbound Cruise (start of proxops) to 24-OCT-2023 (release + 30 days). This is a trajectory from Brian Sutter (LM) (StartProxOps_To_ReleasePlus30days.bsp). BRIEF -- Version 3.0.0, January 14, 2008 -- Toolkit Version N0064 Summary for: orx_160908_231024_pgaa3_day06m60_v1.bsp BodieStart of Interval (ET) End of Interval (ET) ---------------------------------- ----------------------------- -64 2016 SEP 08 23:06:08.282 2023 OCT 24 23:21:18.962